Image Gallery
Hover over an image for description. Click on an image to enlarge.
- 60 tonne & 40 tonne Liebherr's Installing a new recycling plant in South Tipperary
- 60 tonne & 40 tonne Liebherr's Top and Tailing Tanks in County Waterford
- 60 tonne Liebherr Installing AHU's to roof of Waterford City Hall
- 140 tonne Liebherr Installing an underpass using full 42t counterweight in County Tipperary
- 140 tonne & 60 tonne Liebherr's Assembling a conveyor system at Belview Port
- 140 tonne Liebherr
- 100 Tonne Liebherr Replacing Glazing at Whitfield Clinic, Waterford City.
- 35 tonne Liebherr Working along side Reginald's Tower, Waterford City
- 35 tonne Liebherr & 60 tonne Marchetti Decommissioning a nitrogen plant at Bausch & Lomb, Waterford City.
- 60 tonne Marchetti Installing AHU's on night shift in Carlow town.
- 100 tonne Liebherr Removing 15 tonne, 33 metre long legs from a jack-up barge in Waterford City
- 35 tonne Liebherr & 60 tonne Marchetti Decommissioning conveyors inside SmartPly, Belview Port.
- 130 tonne Liebherr Installing side cladding at Glanbia, Belview Port
- 130 tonne Liebherr Installing 16.5 tonne culverts in Dungarvan, Co. Waterford
- 60 tonne Marchetti Lifting 11 tonne chiller rooms into position under contract lift conditions at Sanofi, Waterford
- 130 tonne & 35 tonne Liebherr's Top & Tailing a 13 tonne tank in Dungarvan, Co. Waterford
- 35 tonne & 50 tonne Liebherr's Decommissioning an old drying plant at Belview Port
- 130 tonne Liebherr Loading a 23 tonne locomotive in Kilmacow, Co. Kilkenny
- 50 tonne Liebherr
- 35 tonne Liebherr Installing a restored 140 year old footbridge with use of spreader beams in Waterford City
- 130 tonne Liebherr Offloading wind turbine tower sections at Belview Port
- 50 tonne Tadano & 60 tonne Marchetti Unloading machinery at a pharmaceutical plant in Waterford City
- 35 tonne Liebherr & 50 tonne Tadano Installing glazing & lifting sheeting to the roof of a pharmaceutical plant in Waterford City
- 25 tonne Kato(City Crane) & 35 tonne Liebherr Installing a 7 tonne roller inside a pharmaceutical plant in Waterford City
- 25 tonne Kato(City Crane) & 35 tonne Liebherr Installing a 7 tonne roller inside a pharmaceutical plant in Waterford City
- 60 tonne Marchetti Loading 12 tonne ramps on to a SPMT at Belview Port
- 35 tonne Liebherr Constructing a water treatment tank in Kilmeaden, Co.Waterford
- 100 tonne Demag Replacing damaged glazing at Whitfield Clinic, Waterford City
- 60 tonne Marchetti Servicing wind turbines with a 200 tonne crane, Carnsore Point, Co.Wexford
- 35t Kato, 60t Marchetti & 25t Kato Unloading wind turbine components at Belview Port
- 60 tonne Marchetti Servicing wind turbines with a 200 tonne crane, Carnsore Point, Co.Wexford
- 60 tonne Marchetti Lifting a 20t catamaran from the water with use of heavy lifting beams in Dunmore East, Co.Waterford
- 60 tonne Marchetti Servicing wind turbines with a 200 tonne crane, Carnsore Point, Co.Wexford